Selected municipal traffic engineering, warrants, surveys, and TCP assignments. Browse examples below, or return to the Projects overview.
Representative projects
- TRAFFIC ENGINEERING PROJECTS
- Traffic Management Plan (TMP)
- Engineering & Traffic "Speed" Survey
- City Traffic Engineering/Municipal Engineering Services
- On-Call Traffic Engineering Services
- Caltrans District 12's Interstate 5 & State Route 55 Flyover TMP & TCP
- MTA''s Evaluation of RSTI Projects for 7 Agencies
- Conducting Signal & Stop Sign Warrant Assessments for 16 Locations
- Assessment of RTOR for Baldwin Park Blvd. & Dalewood Avenue
- Peyton Avenue Restriping & Resigning Plans Preparation
- Ruben Ayala High School Internal Circulation Study
- Traffic Control Plans for PCH Sewer Lines Repair & Permit Application for — Caltrans D-7
- Santa Monica Pier's Parking Striping Plans
- Experian Corporation HQ Signal Warrants & Queue Studies- Anton Avenue
- City of Tustin's Main Street Water Facility- Traffic Control Plans
- On-Call Traffic Engineering/TCP for Anaheim Water Department
- St. Nicholas Parish Traffic Signal Warrant Study
- Citywide Speed Survey for 5 Major Arterials- Phase I
- Interstate 10 Frwy & Baldwin Park Blvd. Queuing & Traffic Analysis
- Preparing Traffic Signal Timing Chart for Baldwin Park Blvd. & Foster
- Traffic Control Plan Preparations for Brea Canyon Road
- Traffic Control Plan Preparations for Harbor Blvd. & Westminster Blvd.
- Garden Grove, CA Santa Ana, CA
- Stop Sign Installation Warrant Assessment
- Citywide Speed Survey Phase II
- Via Regresso & Via Arribo Traffic Evaluation
- City of Rancho Santa Margarita Speed Limit Sign Inventory
- Engineering & Traffic Survey for Los Flores
- Crosswalk Assessment at the — City of Rancho Santa Margarita Beach Club
- Irvine Ranch Water District's Dyer Road Facility TCP
- Redondo Beach's Engineering & Traffic Survey for 12 Corridors
- Truck Route Feasibility Study for Vulcan Materials Plant
- Consulting Traffic Engineering for Avenue R & 5th Street East Intersection Improvement
- Preparing TCP for Vintage Shores Senior Apartments on Camino De Estrella
- Preparing TCP for Neilson Way for Water & Sewer Lines Repair
- Preparing TCP for Huntington Beach's Central Park & Sports Complex
- Traffic Signal & Stop Sign Warrant Assessment for 11 Locations
- Engineering & Traffic Survey Including 9 Radars for 3 Corridors
- Preparing Signing & Striping Plans for Alta Vista & Copper Hill
- Governor's Island Ferry Stacking for the U.S. Coast Guard